Drying Out the Dam Site at Rahway River Park
November 5th. A Sump Pump is Built.
The area where the new dam will be built needs to be dry. Notice the pipes (first seen in the October 22nd post) that have been sunk below the level of the rest of the site to function as a sump pit. Water collects in the pit, and is pumped out. This will keep the rest of the area dry.
The area where the new dam will be built needs to be dry. Notice the pipes (first seen in the October 22nd post) that have been sunk below the level of the rest of the site to function as a sump pit. Water collects in the pit, and is pumped out. This will keep the rest of the area dry.
Tuesday, December 7, 2010
Rahway River Park Construction Update
I'm way behind on these updates. Going back to October where I left off...
October 25th, the dumpster is loaded onto a truck and driven away.
October 28th, more digging.
One dumpster remaining.
October 25th, the dumpster is loaded onto a truck and driven away.
October 28th, more digging.
One dumpster remaining.